At a Glance –
- Project Type: ‘Refresh’ – a Smaller scale project that might include some upholstery updates for example.
- Project Duration: 3 weeks
We Remastered a 2001 Sealine F33 on the owners berth in Lake Windermere. This project predominantly focused on achieving a modern aesthetic through updates to the upholstery, carpets and sidelinings to name a few elements. Enjoy images clearly demonstrating the transformation into today’s standard – starting with the finished product.
The process…
After an initial enquiry, Sarah Luck our Head Designer travelled to Lake Windermere to custom spec the project with the customer. The next phase was for Shaun, an exceptionally skilled Craftsmen, to travel to the yacht and carefully measure components and take her apart within 2 days – bringing the elements back to our HQ in Plymouth to be made to measure or recovered.
A short while later – Shaun and another skilled Craftsmen travelled back to Windermere to reassemble the yacht within 2.5 days – creating a modern look and feel, transforming this F33. Additional work was carried out while on the yacht as our team will always exceed expectations.
We can either complete our design & refit work on your berth as with this F33, or we can arrange for your yacht to be brought to our HQ in Plymouth.
Don’t hesitate to get in contact today to discuss a design and refit project.
Contact usConsidering a Design & Refit project?
We look forward to realising The Art of The Possible with you.
Princess 61 – 2004
If there was ever an owner who has truly fallen in love with his boat all over again…it would be Jim. From the day we met Jim and Michelle, it was clear Princess Mitchie was close to their hearts and now “she’s got her frock on” – Jim Davidson.
Find Out More- Remastered Maritime
Case Studies
We believe that true luxury evolves through a lifetime of dedication. But it is often hard to quantify what raises something to the level of a luxury product. It is more than a name or a logo: rather it is an attitude, a constant striving for perfection.
Find Out MoreTarga 50GT – 2012
This 2012 Fairline Targa 50GT project was complete within just over 3 weeks on the owners berth. The soft greys, contrasting colours and textures of this scheme now bring a modern high-end feel to this yacht.
Find Out More